During the installation of PVC row trunking, the following key points should be noted to ensure the quality of installation and safety of subsequent use:

Choose the appropriate specifications: First, it is necessary to select the appropriate specifications of PVC row trunking according to the actual wiring requirements and space size. Make sure that the trunking can accommodate the required number of wires without causing waste or inconvenience due to oversize or undersize.

Accurate measurement and positioning: Before installation, the installation area should be accurately measured, and the starting and ending positions of the trunking and the position of the fixing points should be determined based on the measurement results. Use a laser level or other tools to ensure the horizontal or vertical installation accuracy of the trunking.

Selection and construction of fixing methods: There are many ways to fix PVC row trunking, such as using fixing clips, screws, etc. When choosing a fixing method, ensure that the fixing point is stable and reliable and can withstand the weight of the trunking and wires. During construction, the specifications should be strictly followed to ensure that the fixing points are evenly distributed and the spacing is reasonable.

Wiring and fixing: Before introducing the wires into the trunking, check whether the wires are damaged or aged. After the wires are introduced, they should be wired according to the specifications to avoid crossing or entanglement of the wires. At the same time, the wires should be fixed in the wire trough with fixing tools such as cable ties to prevent the wires from shaking or falling off.

Interface processing: PVC row trunking may encounter situations where splicing is required during installation. When splicing, ensure that the interface is flat and tight, without gaps or misalignment. Use special glue or connectors for fixing to enhance the firmness of the interface.

Inspection and acceptance: After the installation is completed, the entire wiring system should be fully inspected. Check whether the wire trough is firmly installed, whether the wire is reliably fixed, and whether the interface is tight. At the same time, a power-on test should be carried out to ensure that the system operates normally without abnormalities.

Safety precautions: During the installation process, the safety operating procedures should be strictly followed and personal protective equipment should be worn. Avoid construction in dangerous environments such as humid, flammable, and explosive environments. In case of special circumstances, seek help from professionals in a timely manner.

In summary, the installation process of PVC row trunking requires meticulous operation to ensure that every step meets the specifications and requirements. Only in this way can the safe and stable operation of the wiring system be guaranteed.
×